champ clark logo 07 300
 MoDOT logo  IDOT

A new Champ Clark Bridge will be design and constructed using the design-build procurement method.  The following link explains the design-build method: http://www.modot.org/business/consultant_resources/DesignBuildInformation.htm.

Bridge

Intersection

Public Meeting Information

News Release - August 24, 2017

Handout from meeting

Engineering Design of Bridge

Schedule

Champ Clark Bridge Presentation to Missouri Highways and Transportation Commission (PDF)

Friday, April 21
3 p.m. - 5 p.m.
Twin Pike YMCA
611 Kelly Lane
Louisiana, MO 66353
See attached flyer for details and RSVP information

Sign Up For Alerts

Upcoming Maintenance

Routine Maintenance

September 12

12 noon to 3 p.m.

One Lane Traffic

 

Public Meetings

Groundbreaking Ceremony

for a NEW Champ Clark Bridge!

Friday, September 8

10 a..m. - 11 a.m.

Riverfront in Louisiana, MO