champ clark logo 07 300
 MoDOT logo  IDOT

A new Champ Clark Bridge will be design and constructed using the design-build procurement method.  The following link explains the design-build method: http://www.modot.org/business/consultant_resources/DesignBuildInformation.htm.

Bridge

Intersection

Public Meeting Information

News Release - August 24, 2017

Handout from meeting

Engineering Design of Bridge

Schedule

Champ Clark Bridge Presentation to Missouri Highways and Transportation Commission (PDF)

The Missouri Department of Transportation, in conjunction with Moberly Area Community College and several recruitment and training facilities, potential consultants and contractors, held a job fair for those interested in developing their skills or using their experience to help design and build a NEW Champ Clark Bridge!  The video below highlights some of the activity from the event, and we encourage anyone interested in a potential job opportunity to come back to the web site later next spring for information about another job fair.


Video pic for web



Sign Up For Alerts

Upcoming Maintenance

Routine Maintenance

September 12

12 noon to 3 p.m.

One Lane Traffic

 

Public Meetings

Groundbreaking Ceremony

for a NEW Champ Clark Bridge!

Friday, September 8

10 a..m. - 11 a.m.

Riverfront in Louisiana, MO