champ clark logo 07 300
 
 MoDOT logoIDOT  

A new Champ Clark Bridge will be design and constructed using the design-build procurement method.  The following link explains the design-build method: http://www.modot.org/business/consultant_resources/DesignBuildInformation.htm.

For local resident or media inquiries, please contact Brian Haeffner , P.E., Area Engineer for MoDOT, or Marisa Ellison , M.B.C.,
Communications Manager for MoDOT.  The phone number is 573-248-2490 or 1-888-275-6636 (general customer service).  To reach the entire team, email This email address is being protected from spambots. You need JavaScript enabled to view it..

Bridge

Intersection

Champ Clark Bridge Team:  Keith Killen, P.E., Project Director, MoDOT; Brandi Baldwin, P.E., Deputy Project Director, MoDOT (now Resident Engineer overseeing construction of the project); Jay M. Wavering, P.E., Illinois Department of Transportation; Michael Baxter, P.E., MoDOT; Jeff Gander, P.E., MoDOT; Erik Kopinski, P.E., MoDOT

 

Design Components of the Bridge

Rebar an shaft plans

Public Meeting Information

News Release - August 24, 2017

Handout from meeting

Engineering Design of Bridge

Schedule

Champ Clark Bridge Presentation to Missouri Highways and Transportation Commission (PDF)

 

Sign Up For Alerts

Upcoming Maintenance

There is no upcoming maintenance planned.

Public Meetings